JUNO MACHINERYChina Food Processing Equipment Request a Quote
Stainless steel cooking equipment assembled in a workshop
Company & factory · Zhucheng, Shandong, China

How the equipment
is actually produced

Ten stages from drawing to handover — and where each one happens. Production is organised with partner factories in the Zhucheng food-machinery base; JUNO holds the specification, the drawings and the inspection record for every order.

Company

Zhucheng, Shandong — the food-machinery base

JUNO MACHINERY (诸城市聚诺机械有限公司) works on food processing equipment for overseas buyers: washing, cutting, blanching, cooking, drying and sterilization, supplied as single machines or as continuous lines.

What is done in-house is the engineering and the coordination: requirement review, machine configuration, drawing control, inspection arrangement, export documentation and after-sales follow-up. What is done in the factories is the fabrication, welding, assembly and finishing.

We state this clearly rather than presenting another company's workshop as our own. Every photograph on this page is labelled for what it shows.

Design officeStructure sketches, 2D drawings, 3D models
ProductionPartner factories in the Zhucheng base, built to our drawing set
InspectionPre-shipment check against the drawing set, photographed
ExportPacking list, manual, spare-parts list, loading
Production stages

Ten stages, from drawing to handover

Each stage below has a defined output: a drawing, an inspection record, a packing list. That is what makes a custom machine repeatable rather than a one-off.

Production organisation — food machinery production stage
Reference photograph — production environment for stainless equipment.
STAGE 01

Production organisation

Machines are built to the released drawing set. Production is organised with partner factories in the Zhucheng food-machinery base; JUNO holds the specification, the drawings and the inspection record for each order.

Design & drawing office — food machinery production stage
Photograph: design and drawing work at the JUNO office.
STAGE 02

Design & drawing office

Structure, layout and part drawings are prepared before production starts, so the workshop works from a dimensioned package rather than from a sample.

Sheet metal & forming — food machinery production stage
Reference photograph — stainless vessel fabrication.
STAGE 03

Sheet metal & forming

Tanks, frames and covers are cut, formed and rolled in food-grade stainless steel. Wall thickness and surface finish are called out on the part drawings.

Welding & surface finishing — food machinery production stage
Reference photograph — welded vessel with dressed seams.
STAGE 04

Welding & surface finishing

Welds are dressed and pickled where the surface is product-contact, so there is no weld scale to trap residue and no rough edge to hold product.

Assembly — food machinery production stage
Photograph: assembled cooking equipment before dispatch.
STAGE 05

Assembly

Frames, drives, belts and controls are assembled and aligned on the shop floor; the assembly drawing is used as the check sheet.

Running & adjustment — food machinery production stage
Reference photograph — multi-fan drying section.
STAGE 06

Running & adjustment

Each unit is run dry, then with product where samples exist: belt tracking, spray pattern, conveyor speed and safety interlocks are adjusted before it is accepted.

Pre-shipment inspection — food machinery production stage
Reference photograph — modular line section.
STAGE 07

Pre-shipment inspection

The finished unit is checked against the drawing set — dimensions, material, motors, control configuration — and photographed before packing.

Packing — food machinery production stage
Reference photograph — dewatering unit prepared for packing.
STAGE 08

Packing

Frames and vessels are braced, wrapped and packed with the accessories in a single shipment, with the packing list matched to the drawing set.

Loading & export — food machinery production stage
Photograph: vessels secured on the transport before dispatch.
STAGE 09

Loading & export

Complete vessels travel as units where the route allows; cradles and straps are positioned so nothing moves in transit.

Installation & handover — food machinery production stage
Photograph: installation of a stainless washing tank on site.
STAGE 10

Installation & handover

On site the unit is set, levelled and connected; commissioning and operator training follow where the contract includes them.

Documents

What travels with the equipment

DocumentIssued
Drawing setArrangement, assembly and part drawings, parts list
Inspection recordPre-shipment check sheet with photographs
Packing listItems, quantities, dimensions, marks
ManualOperation, cleaning and maintenance instructions in English
Spare-parts listWearing parts with part references

Floor area, headcount, annual output and number of export markets are not published on this page: those figures are commercial information and, where they exist, are given in writing on request.

Want to see where your machine is built?

Visits to the production site can be arranged around your order — or handled as a scheduled video walk-around if you cannot travel.

WhatsApp