Seven checks that happen before equipment is dispatched. Each one has a record; a machine that fails a check is corrected before packing, not after delivery.
The list is deliberately specific, because “strict quality control” is a phrase, not a procedure.
Material certificate for the sheet and tube used on product-contact surfaces; visual check for mixed grades at the workshop.
Key dimensions checked against the arrangement drawing, including inlet and outlet heights that must match neighbouring machines.
Weld appearance, penetration on critical joints, grinding and pickling of product-contact welds; no undercut left in the product path.
No sharp edges, no crevices, no dead corners where product can sit; drainage falls checked on tanks.
Shaft alignment, bearing fit, chain and belt tension; rotating parts turned by hand before power is applied.
Dry run for direction, speed, temperature and control logic; with product where the product is available.
Cleaning after test, loose parts secured, guards in place, documents enclosed, packing list checked against the order.
Check sheets, run-test notes and photographs are kept with the project file and can be sent with the dispatch documents.
We do not display certificates we do not hold, and we do not describe equipment as certified for a market unless the paperwork exists for that market.
Where a market requires a specific certification for the equipment or the electrical installation, we state at quotation stage whether it can be provided, and by whom. If it cannot, we say so before the order rather than after.
Send the product, the output and the site conditions; we reply with scope, equipment and the questions we still need answered.