
The line is drawn on your building plan: machines, transfers, operator positions, buffer sections and utility points.
A building plan with dimensions, the wall and floor conditions, and the position of existing services.
We do not issue a document that has no basis in the equipment actually built, and we do not publish capacity, power or dimension figures that have not been confirmed for the project. Where something is still open, the document says “to be confirmed”.
Send the product, the output and the site conditions; we reply with scope, equipment and the questions we still need answered.